Concluded developments - Dams

Barragem Palmital Barragem MSS

Portfolio of work - Dams

CLIENT LOCATION WORK/SERVICE PERIOD
SAMARCO MINERAÇÃO S/A Mariana - MG Earthmoving and construction works of Fundão Dam (Dikes 1 and 2) 2007
CVRD Rio Piracicaba - MG Earthmoving for heightening of Diogo Dam at Agua Limpa Mine 2007
CVRD Canaã dos Carajás Rio Verde Dam - Water supply 2003
CVRD Canaã dos Carajás Tailings Dam - mining at Serra do Sossego 2002
COMPANHIA MINEIRA DE METAIS - CMM-SP Três Marias-MG Civil works carried out on the
pump system of Três Marias Tailings Dam, Três Marias – MG
2001
COMPANHIA MINEIRA DE METAIS - CMM Três Marias-MG Civil works carried out on the pump system of Três Marias Tailings Dam and the surface drainage system in Três Marias – MG 2001
CVRD Itabiara-MG Drainage services on various dams 1990-93
CBA Mairinque-SP Mairinque – SP
Building services carried out on Palmital Tailings Dam, 1st step-elevation: 811.0m; 2nd step-elevation: 837.0m; 3rd step-elevation: 850.0m in aluminum
1988-90
RIO PARACATU MINERAÇÃO S/A
(GRUPO RTZ)
Paracatu-MG Construction of 2nd and 3rd steps of Morro do Ouro Mine Tailings Dam 1988-89
CODEVASF Porteirinha-MG Construction of Mocambinho Dam 1988-89
FERTECO MINERAÇÃO S/A Ouro Preto-MG Construction of Forquilha ii Dam and heightening of Forquilha Dam i 1988-89
MBR S/A Nova Lima-MG Construction of the Ecological Dam #7 located at Águas Claras Mine 1987-88
MBR S/A Nova Lima-MG Construction of the Ecological Dam #5 at Mutuca Mine 1987-88
MBR S/A Nova Lima-MG Construction of the Ecological Dam #4 at Mutuca Mine 1984-85